AV第一福利APP导航,五楼自拍第一页在线观看,色se01短视频永久免费,亚洲第一丁香肉成网,国产免费久久精品99re不卡,日本XXXX高清在线观看

您好,歡迎訪問(wèn)濟(jì)南慶飛機(jī)械設(shè)備有限公司官網(wǎng) 網(wǎng)站

全國(guó)咨詢熱線:

15621892888
15550061228

當(dāng)前位置:首頁(yè)>新聞資訊>公司新聞 固定升降貨梯安裝好之后怎么進(jìn)行調(diào)試?

固定升降貨梯安裝好之后怎么進(jìn)行調(diào)試?

文章出處:http://www.cssnam.com/ 人氣: 0 發(fā)表時(shí)間:2022-05-23
設(shè)備到貨后我們先要做好安裝前的準(zhǔn)備,安裝工程師需先對(duì)施工現(xiàn)場(chǎng)進(jìn)行施工確認(rèn),再對(duì)施工現(xiàn)場(chǎng)進(jìn)行水平測(cè)試。然后將設(shè)備運(yùn)到施工現(xiàn)場(chǎng)后,我們施工人員需要清點(diǎn)所有施工工具以及升降貨梯設(shè)備,一切準(zhǔn)備就緒后,我們就可以進(jìn)行施工安裝了。
After the arrival of the equipment, we should first make preparations before installation. The installation engineer should first confirm the construction on the construction site, and then conduct level test on the construction site. Then, after the equipment is transported to the construction site, our construction personnel need to count all construction tools and elevator equipment. After everything is ready, we can carry out construction and installation.
那么當(dāng)液壓升降貨梯安裝好后我們應(yīng)該怎樣正確調(diào)試?升降貨梯在安裝移動(dòng)時(shí)要注意,如果升降梯安裝不當(dāng)會(huì)很容易造成設(shè)備故障或事故,接下來(lái)下面河南液壓升降貨梯廠家就為大家普及一些升降設(shè)備安裝后正確調(diào)試的知識(shí),希望能夠給大家提供幫助!
So how should we correctly debug the hydraulic elevator after it is installed? Pay attention to the installation and movement of the elevator. If the elevator is not installed properly, it will easily cause equipment failure or accident. Next, Henan hydraulic elevator manufacturer will popularize some knowledge of correct debugging of the elevator after installation, hoping to help you!
1、工作前穿戴好個(gè)人勞動(dòng)保護(hù)用品,特別注意戴好防護(hù)帽,高空作業(yè)系好防護(hù)帶,電工、焊工穿絕緣鞋,并檢查所有使用的工具;
1. Wear personal labor protection articles before work, pay special attention to wearing protective helmets, fasten protective belts for high-altitude operation, electricians and welders wear insulating shoes, and check all tools used;
2、在調(diào)試升降機(jī)前一定穿好絕緣鞋、戴好絕緣手套或者站在絕緣墊上,否則禁止施工;
2. Before commissioning the elevator, be sure to wear insulating shoes, gloves or stand on the insulating pad, otherwise construction is prohibited;
3、在安裝時(shí),應(yīng)先與現(xiàn)場(chǎng)施工單位負(fù)責(zé)人取得聯(lián)系,共同研究雙方在現(xiàn)場(chǎng)工作中的措施與注意事項(xiàng),共同遵守執(zhí)行;
3. During installation, contact with the person in charge of the on-site construction unit first, jointly study the measures and precautions of both parties in the on-site work, and jointly abide by and implement them;
4、升降貨梯工作時(shí)在每層廳門(mén)外,掛有井下有人工作的標(biāo)牌;
4. When the cargo elevator is working, there is a sign that someone is working underground outside the hall on each floor;
5、在井道工作時(shí),采用36V工作照明燈,在轎廂內(nèi)工作時(shí)采用12V工具照明燈;
5. When working in the hoistway, 36V working lamp is used, and 12V tool lamp is used when working in the lift car;
6、工作場(chǎng)所下面不準(zhǔn)停人,下腳手架時(shí)不準(zhǔn)滑下和跳下;
6. No one is allowed to stop under the workplace, and no one is allowed to slide and jump off the scaffold;
7、在調(diào)試中開(kāi)車(chē)人員要配合好調(diào)試人員,精神要集中,聽(tīng)從調(diào)試人員的指揮;
7. During commissioning, the driving personnel shall cooperate well with the commissioning personnel, concentrate and obey the command of the commissioning personnel;
8、在調(diào)試電梯與井道作業(yè)時(shí),嚴(yán)禁酒后操作、打鬧、開(kāi)玩笑,搞好協(xié)作,監(jiān)護(hù)他人工作;
8. During the commissioning of elevator and hoistway operations, it is strictly prohibited to operate after drinking, make trouble and joke, do a good job in cooperation and supervise the work of others;
9、動(dòng)用氣、電焊時(shí),要遵守氣、電焊操作規(guī)程,注意防火;
9. When using gas and electric welding, observe the operating procedures of gas and electric welding and pay attention to fire prevention;
 

?